Bulgaria vs Montenegro: Key features of liberal democracy, gaps filled
Bulgaria
0.499
in 2025
Montenegro
0.5
in 2025
Bulgaria rank
67th
Montenegro rank
66th
Key features of liberal democracy, gaps filled over time
- Bulgaria
- Montenegro
How they compare
Montenegro currently reports 0.5 against 0.499 in Bulgaria, a difference of 0.001.
The two have swapped places 1 time across 46 shared years of data; in 1900 it was Bulgaria ahead.
Bulgaria ranks 67th and Montenegro ranks 66th of 176 countries.
Bulgaria has averaged higher in every one of the 6 decades both report.
Head to head by decade
| Decade | Bulgaria | Montenegro | Difference | Ahead |
|---|---|---|---|---|
| 1900s | 0.1786 | 0.0989 | 0.0797 | Bulgaria |
| 1910s | 0.1787 | 0.1019 | 0.0769 | Bulgaria |
| 1990s | 0.6125 | 0.261 | 0.3515 | Bulgaria |
| 2000s | 0.6104 | 0.3788 | 0.2316 | Bulgaria |
| 2010s | 0.5459 | 0.3915 | 0.1544 | Bulgaria |
| 2020s | 0.544 | 0.4578 | 0.0862 | Bulgaria |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher key features of liberal democracy, gaps filled, Bulgaria or Montenegro?
- Montenegro, at 0.5 against 0.499 in Bulgaria as of 2025.
- What is the difference in key features of liberal democracy, gaps filled between Bulgaria and Montenegro?
- 0.001, with Montenegro ahead.
- How many years of comparable data are there for Bulgaria and Montenegro?
- 46 years are reported by both, from 1900 to 2025.
- How do Bulgaria and Montenegro rank globally for key features of liberal democracy, gaps filled?
- Bulgaria ranks 67th and Montenegro ranks 66th of 176 countries.
- Where does this data come from?
- Statizoid (derived), published as Key features of liberal democracy, gaps filled. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Key features of liberal democracy with 58 missing years estimated by linear interpolation between the nearest real observations. Only gaps of 4 years or fewer are filled, and never beyond the first or last actual measurement — these are filled holes, not forecasts.