Barbados vs Uruguay: Liberal democracy row, gaps filled
Barbados
3
in 2025
Uruguay
3
in 2025
Barbados rank
1st
Uruguay rank
1st
Liberal democracy row, gaps filled over time
- Barbados
- Uruguay
How they compare
Barbados currently reports 3 against 3 in Uruguay, a difference of 0.
The two have swapped places 2 times across 126 shared years of data; in 1900 it was Uruguay ahead.
Barbados ranks 1st and Uruguay ranks 1st of 176 countries.
Across the 13 decades both report, Barbados averaged higher in 2 and Uruguay in 9.
Head to head by decade
| Decade | Barbados | Uruguay | Difference | Ahead |
|---|---|---|---|---|
| 1900s | 0 | 1 | 1 | Uruguay |
| 1910s | 0 | 1 | 1 | Uruguay |
| 1920s | 0 | 1.7 | 1.7 | Uruguay |
| 1930s | 0 | 1.3 | 1.3 | Uruguay |
| 1940s | 0 | 2 | 2 | Uruguay |
| 1950s | 0.6 | 2 | 1.4 | Uruguay |
| 1960s | 2 | 2 | 0 | — |
| 1970s | 2 | 0.6 | 1.4 | Barbados |
| 1980s | 2 | 1.5 | 0.5 | Barbados |
| 1990s | 2 | 3 | 1 | Uruguay |
| 2000s | 2 | 3 | 1 | Uruguay |
| 2010s | 2.5 | 3 | 0.5 | Uruguay |
| 2020s | 3 | 3 | 0 | — |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher liberal democracy row, gaps filled, Barbados or Uruguay?
- Barbados, at 3 against 3 in Uruguay as of 2025.
- What is the difference in liberal democracy row, gaps filled between Barbados and Uruguay?
- 0, with Barbados ahead.
- How many years of comparable data are there for Barbados and Uruguay?
- 126 years are reported by both, from 1900 to 2025.
- How do Barbados and Uruguay rank globally for liberal democracy row, gaps filled?
- Barbados ranks 1st and Uruguay ranks 1st of 176 countries.
- Where does this data come from?
- Statizoid (derived), published as Liberal democracy row, gaps filled. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Liberal democracy row with 71 missing years estimated by linear interpolation between the nearest real observations. Only gaps of 4 years or fewer are filled, and never beyond the first or last actual measurement — these are filled holes, not forecasts.