Mongolia vs Sri Lanka: Electoral democracy row, gaps filled
Mongolia
2
in 2025
Sri Lanka
2
in 2025
Mongolia rank
1st
Sri Lanka rank
1st
Electoral democracy row, gaps filled over time
- Mongolia
- Sri Lanka
How they compare
Mongolia currently reports 2 against 2 in Sri Lanka, a difference of 0.
The two have swapped places 6 times across 115 shared years of data; in 1911 it was Sri Lanka ahead.
Mongolia ranks 1st and Sri Lanka ranks 1st of 176 countries.
Across the 12 decades both report, Mongolia averaged higher in 3 and Sri Lanka in 6.
Head to head by decade
| Decade | Mongolia | Sri Lanka | Difference | Ahead |
|---|---|---|---|---|
| 1910s | 0 | 0 | 0 | — |
| 1920s | 0 | 0 | 0 | — |
| 1930s | 0 | 0 | 0 | — |
| 1940s | 0 | 0.5 | 0.5 | Sri Lanka |
| 1950s | 0 | 2 | 2 | Sri Lanka |
| 1960s | 0 | 2 | 2 | Sri Lanka |
| 1970s | 0 | 2 | 2 | Sri Lanka |
| 1980s | 0 | 1.3 | 1.3 | Sri Lanka |
| 1990s | 1.9 | 1.5 | 0.4 | Mongolia |
| 2000s | 2 | 1.3 | 0.7 | Mongolia |
| 2010s | 2 | 1.5 | 0.5 | Mongolia |
| 2020s | 1.83 | 2 | 0.1667 | Sri Lanka |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher electoral democracy row, gaps filled, Mongolia or Sri Lanka?
- Mongolia, at 2 against 2 in Sri Lanka as of 2025.
- What is the difference in electoral democracy row, gaps filled between Mongolia and Sri Lanka?
- 0, with Mongolia ahead.
- How many years of comparable data are there for Mongolia and Sri Lanka?
- 115 years are reported by both, from 1911 to 2025.
- How do Mongolia and Sri Lanka rank globally for electoral democracy row, gaps filled?
- Mongolia ranks 1st and Sri Lanka ranks 1st of 176 countries.
- Where does this data come from?
- Statizoid (derived), published as Electoral democracy row, gaps filled. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Electoral democracy row with 71 missing years estimated by linear interpolation between the nearest real observations. Only gaps of 4 years or fewer are filled, and never beyond the first or last actual measurement — these are filled holes, not forecasts.