Malaysia vs Slovenia: Electoral democracy row, gaps filled
Malaysia
2
in 2025
Slovenia
2
in 2025
Malaysia rank
1st
Slovenia rank
1st
Electoral democracy row, gaps filled over time
- Malaysia
- Slovenia
How they compare
Malaysia currently reports 2 against 2 in Slovenia, a difference of 0.
The two have swapped places 4 times across 126 shared years of data; in 1900 it was Slovenia ahead.
Malaysia ranks 1st and Slovenia ranks 1st of 176 countries.
Across the 13 decades both report, Malaysia averaged higher in 4 and Slovenia in 5.
Head to head by decade
| Decade | Malaysia | Slovenia | Difference | Ahead |
|---|---|---|---|---|
| 1900s | 0 | 0 | 0 | — |
| 1910s | 0 | 0.1 | 0.1 | Slovenia |
| 1920s | 0 | 0 | 0 | — |
| 1930s | 0 | 0 | 0 | — |
| 1940s | 0 | 0 | 0 | — |
| 1950s | 0.5 | 0 | 0.5 | Malaysia |
| 1960s | 1 | 0 | 1 | Malaysia |
| 1970s | 0.6 | 0 | 0.6 | Malaysia |
| 1980s | 1 | 0 | 1 | Malaysia |
| 1990s | 1 | 2 | 1 | Slovenia |
| 2000s | 1 | 2 | 1 | Slovenia |
| 2010s | 1 | 2 | 1 | Slovenia |
| 2020s | 1.5 | 2 | 0.5 | Slovenia |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher electoral democracy row, gaps filled, Malaysia or Slovenia?
- Malaysia, at 2 against 2 in Slovenia as of 2025.
- What is the difference in electoral democracy row, gaps filled between Malaysia and Slovenia?
- 0, with Malaysia ahead.
- How many years of comparable data are there for Malaysia and Slovenia?
- 126 years are reported by both, from 1900 to 2025.
- How do Malaysia and Slovenia rank globally for electoral democracy row, gaps filled?
- Malaysia ranks 1st and Slovenia ranks 1st of 176 countries.
- Where does this data come from?
- Statizoid (derived), published as Electoral democracy row, gaps filled. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Electoral democracy row with 71 missing years estimated by linear interpolation between the nearest real observations. Only gaps of 4 years or fewer are filled, and never beyond the first or last actual measurement — these are filled holes, not forecasts.