Denmark vs Nigeria: Electoral democracy row, gaps filled
Denmark
2
in 2025
Nigeria
2
in 2025
Denmark rank
1st
Nigeria rank
1st
Electoral democracy row, gaps filled over time
- Denmark
- Nigeria
How they compare
Denmark currently reports 2 against 2 in Nigeria, a difference of 0.
The two have swapped places 5 times across 112 shared years of data; in 1914 it was Denmark ahead.
Denmark ranks 1st and Nigeria ranks 1st of 176 countries.
Denmark has averaged higher in every one of the 12 decades both report.
Head to head by decade
| Decade | Denmark | Nigeria | Difference | Ahead |
|---|---|---|---|---|
| 1910s | 2 | 0 | 2 | Denmark |
| 1920s | 2 | 0 | 2 | Denmark |
| 1930s | 2 | 0 | 2 | Denmark |
| 1940s | 1.5 | 0 | 1.5 | Denmark |
| 1950s | 2 | 0 | 2 | Denmark |
| 1960s | 2 | 0 | 2 | Denmark |
| 1970s | 2 | 0.1 | 1.9 | Denmark |
| 1980s | 2 | 0.3 | 1.7 | Denmark |
| 1990s | 2 | 0.1 | 1.9 | Denmark |
| 2000s | 2 | 1 | 1 | Denmark |
| 2010s | 2 | 1.8 | 0.2 | Denmark |
| 2020s | 2 | 1.33 | 0.6667 | Denmark |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher electoral democracy row, gaps filled, Denmark or Nigeria?
- Denmark, at 2 against 2 in Nigeria as of 2025.
- What is the difference in electoral democracy row, gaps filled between Denmark and Nigeria?
- 0, with Denmark ahead.
- How many years of comparable data are there for Denmark and Nigeria?
- 112 years are reported by both, from 1914 to 2025.
- How do Denmark and Nigeria rank globally for electoral democracy row, gaps filled?
- Denmark ranks 1st and Nigeria ranks 1st of 176 countries.
- Where does this data come from?
- Statizoid (derived), published as Electoral democracy row, gaps filled. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Electoral democracy row with 71 missing years estimated by linear interpolation between the nearest real observations. Only gaps of 4 years or fewer are filled, and never beyond the first or last actual measurement — these are filled holes, not forecasts.